Project Information
Intermediate pump station for increasing the capacity of the existing pileline of oil products (Gasoline and Oil) between BANIAS and TISHREEN tanks in Homs by using batching pigs, together with all required pips, tanks, pumps, control system, and related facilities.
| Client | Syrian Company for Oil Transport (SCOT) |
| Status | Completed |
| Duration | 6 Months (2006-2007) |
| Service | Basic study, Detail Engineering and Supervision for Construction services |
| Business | Oil Refinery |
| Capacity | – |
| Location | BANIAS, Syria |