Project Information
Refinery train with 210,000 BPSD to fix total refining capacity of 360,000 BPSD, by producing minimum of fuel oil, and maximum of gasolie and upgrading the refiery products to the international standards
Namvaran’s handling of Basic Design for Abadan and Lavan Refineries was among first such audacious steps taken in the region by a domestic engineering firm.
| Client/ Owner | National Iranian Oil Engineering & Construction Company (NIOEC) |
| Status | Completed |
| Duration | 10 Months (2007-2009) |
| Scope | Engineering |
| Business or Market | Oil Refinery |
| Capacity | 360,000 BPSD |
| Location | Abadan – Iran |