Project Information

Petroleum Engineering and Development Company (PEDEC) is intended to develop SEPEHR-JUFAIR field located about 50 kilometers South West of Ahwaz, Khuzestan Province.
During this project (Phase 1), 12 vertical (Fahliyan), 1 vertical (Gadvan) and 4 horizontal (Ilam) wells are planned to be drilled in Sepehr- Jufair field. 3 existing Ilam wells, 1 Sarvak well and 4 new Ilam wells in Jufair area will also be equipped with Pumps (ESP & SPR). A production rate of 36,000 barrels of crude oil per day is stipulated at the end of Phase 1 in 31 months. A first target production (FTP) of 21,000 barrels of crude oil per day is foreseen within the first 24 months.

Client/ OwnerPasargad Energy Development Company (PEDC)
StatusOngoing
Duration2020
ScopeEngineering
Business or MarketOil & Gas Facilities Production
Capacity36000 bbd
LocationWest Karun – Khuzestan province (Sepehr – Jufair Field) – Iran