Project Information
Both PET and Engineering Polymers Plants are among the most complicated petrochemical plants in polymerization embracing the most intricate processes and operating equipment especially in the Poly Carbonate unit. These projects were started by collaboration of a foreign partner; however conditions led Namvaran to fulfill the job on its own.
| Client/ Owner | Shahid Tondgooian Petrochemical Company (STPC) |
| Status | Completed |
| Duration | 20 Months (2001-2005) |
| Scope | EP, Field Engineering |
| Business or Market | Petrochemical |
| Capacity | Bottle grade PET: 400 TPD Tectile grade PET: 400 TPD Staple Fiber: 200 TPD POY Filament: 200 TPD |
| Location | Bandar Imam – Iran |