Project Information
The C3+ Fractionation Plant consists of the following process sections: C3+ feed surge drum to stabilize and remove any dissolved gases in the feed, a De-ethanizer, De-propanizer, De-butanizer, C3 Stripper and C3 Splitter to separate the different products and Propane refrigeration section to supply external refrigeration for the columns. Additionally, the C3+ Fractionation Plant will have a hydrogenation section.
| Client | Arya Sasol Company |
| Status | Finished |
| Duration | 50 Days |
| Service | Basic Design |
| Business | Petrochemical |
| Capacity | Polymer grade Propylene:35000 Ton per year Propane:6000 Ton per year C4 Cut:65000 Ton per year C5+:60000 Ton per year |
| Location | Arya Sasol Petrochemcial Complex (Assaluyeh) |