Project Information
the summaries of activities to be performed are Design of a tripod (FSP) and a 4-legged WHP, design of an 8-legged Production and Living Quarter Platform jacket (NCE scope was limited to design of tripode)
| Client | National Iranian Oil Company (NIOC) |
| Status | Completed |
| Duration | 18 Months (2000-2002) |
| Service | Engineering |
| Market | offshore |
| Approximate weight of modules | FSP:400 WHP Topside:2000 WHP jacket:1200 PLQP jacket:2000 Topside P:2500 Topside LQ:2000 |
| Approximate Water Depth | 65 m |