Project Information
∗ Refinery Scheme Opimization Study (LP Modeline)
∗ Reviewing the Pre – Basic Design Report (by Namvaran and UDHE) and finalize refining configuration to cover the following main requirements:
– Total through put of 50,000 BPSD mixed curde oil and condensate.
– The mixed feed stock shall compose of 30,000 BPSD LAVAN Export Crude Oil and 20,000 BPSD South Pars Condensate.
∗Preparing the basic design package for Open Art units, Licensed units as well as Utilities and Offsites facilities for the case of through put of 50,000 BPSD.
∗ Preparing EPC tender documents for EPC phase of the package
| Client | Lavan Oil Refinery Company |
| Status | Completed |
| Duration | 6 Months (2006-2007) |
| Service | Basic Engineering and Preparation of tender document for EPC execution |
| Business | Oil Refinery |
| Capacity | |
| Location | Lavan Island – Iran |